Off to the west of the house is the septic leach field. It's 12' wide x 80' long and has to go down at least 6'. This had to be blasted, too, since bedrock seems to be about 2" below the grade everywhere on this site. Just kidding. Luckily, we have a youtube video of that blast. Click on the pic below to see it.