MKA Home Page

Totally Awesome House

The Design

Excavation

Blasting & Septic

Footings

Foundation

Framing

Floors!

Ceilings

Roofing

Siding

Drywall

Cabinets

Stairs

Insulation

Painting

Final Shots

Off to the west of the house is the septic leach field. It's 12' wide x 80' long and has to go down at least 6'. This had to be blasted, too, since bedrock seems to be about 2" below the grade everywhere on this site. Just kidding. Luckily, we have a youtube video of that blast. Click on the pic below to see it.