MKA Home Page
Totally Awesome House
The Design
Excavation
Blasting & Septic
Footings
Foundation
Framing
Floors!
Ceilings
Roofing
Siding
Drywall
Cabinets
Stairs
Insulation
Painting
Final Shots
After the blasting, Chuck cleared away the loose, blown up rock and started cutting footing trenches. This is the east footing, by the Lower Level Bedrooms.