MKA Home Page

Totally Awesome House

The Design

Excavation

Blasting & Septic

Footings

Foundation

Framing

Floors!

Ceilings

Roofing

Siding

Drywall

Cabinets

Stairs

Insulation

Painting

Final Shots

Here's the lower level of the center part of the house. We've started some framing in a vain attempt to brace the concrete walls prior to backfill and slab pour, but the lumber order kept getting screwed up. So, the framing just sticks out like a sore thumb. The concrete walls did survive some very high winds.

Previous