MKA Home Page

Totally Awesome House

The Design

Excavation

Blasting & Septic

Footings

Foundation

Framing

Floors!

Ceilings

Roofing

Siding

Drywall

Cabinets

Stairs

Insulation

Painting

Final Shots

A view of the radiant tubing from the SE corner of the house. That steel column in the foreground will be in the wall seperating two bedrooms and the steel beam above it will define the edge of the house & the deck upstairs.