It
amazed me that they would start bullfloating before they even finished screeding.
But then, these guys pour about two jobs a day. The fellow on the left is
Hugh McDonald of High Country Finishing. He ran the pump hose and also pulled
the mesh up, which in turn pulled up the radiant tubing. The other two guys
pushed and pulled the concrete.