MKA Home Page

Totally Awesome House

The Design

Excavation

Blasting & Septic

Footings

Foundation

Framing

Floors!

Ceilings

Roofing

Siding

Drywall

Cabinets

Stairs

Insulation

Painting

Final Shots

After the concrete trucks and the pump had left, they started slick troweling the slab. In between the pour and the troweling, these guys got to take a break and get a bite to eat. I think they waited about 90 minutes to start slicking.