MKA Home Page
Totally Awesome House
The Design
Excavation
Blasting & Septic
Footings
Foundation
Framing
Floors!
Ceilings
Roofing
Siding
Drywall
Cabinets
Stairs
Insulation
Painting
Final Shots
Brad is pouring the interior footing between the Music Room and the stair. The fellow in the forefront is wearing a portable concrete vibrator that consolidates the concrete. The guy on the top of the rock in the orange vest is the pump operator. He has a remote that controls the pump machine.