MKA Home Page

Totally Awesome House

The Design

Excavation

Blasting & Septic

Footings

Foundation

Framing

Floors!

Ceilings

Roofing

Siding

Drywall

Cabinets

Stairs

Insulation

Painting

Final Shots

More framing of the East Wing. The main level overhangs the foundation walls by 18" on the north and east sides. The window in the concrete below looks into the bathroom and the little blockout in the lower right is for the furnace exhaust.