MKA Home Page
Totally Awesome House
The Design
Excavation
Blasting & Septic
Footings
Foundation
Framing
Floors!
Ceilings
Roofing
Siding
Drywall
Cabinets
Stairs
Insulation
Painting
Final Shots
Now the wall sheathing on the meditation room is complete, along with the minor roof framing. It looks a lot different now that the roof sheathing is on and it blocks out the sunlight.