MKA Home Page
Totally Awesome House
The Design
Excavation
Blasting & Septic
Footings
Foundation
Framing
Floors!
Ceilings
Roofing
Siding
Drywall
Cabinets
Stairs
Insulation
Painting
Final Shots
The north wall is framed as well as the south wall, which sits on top of the flat Glulam beam.
I've started the 3x6 T&G decking.