MKA Home Page
Totally Awesome House
The Design
Excavation
Blasting & Septic
Footings
Foundation
Framing
Floors!
Ceilings
Roofing
Siding
Drywall
Cabinets
Stairs
Insulation
Painting
Final Shots
Here's a different shot looking down the roof toward the west. With Eileen's help, I got that end beam put in place. The blue tarp with all that junk on top of the Music Room roof is covering the rigid insulation for the Great Room and this roof. Electric wiring has to be in place before that can be installed.