MKA Home Page
Totally Awesome House
The Design
Excavation
Blasting & Septic
Footings
Foundation
Framing
Floors!
Ceilings
Roofing
Siding
Drywall
Cabinets
Stairs
Insulation
Painting
Final Shots
There came a day in April when I needed to get the roof dried in. Before I could do that, the ceiling lights and fireplace flue needed to be set. So, I called the electrician to come run his wires. All of the sudden, I had holes in my roof.