MKA Home Page

Totally Awesome House

The Design

Excavation

Blasting & Septic

Footings

Foundation

Framing

Floors!

Ceilings

Roofing

Siding

Drywall

Cabinets

Stairs

Insulation

Painting

Final Shots

Time to start the metal deck. We'll put 3" of concrete on top of this corrugated metal and the radiant tubing will be cast into the concrete, along with plumbing blockouts and electrical floor outlets.