MKA Home Page
Totally Awesome House
The Design
Excavation
Blasting & Septic
Footings
Foundation
Framing
Floors!
Ceilings
Roofing
Siding
Drywall
Cabinets
Stairs
Insulation
Painting
Final Shots
The concrete forms for the deck on the west. There's only three total on this side - one is around the corner out of sight. Tomorrow, the 25 bags of 80 lb sakrete gets delivered and I'll spend the entire day mixing and pouring concrete by hand. Doesn't make sense to get a concrete truck for such a small pour.