MKA Home Page

Totally Awesome House

The Design

Excavation

Blasting & Septic

Footings

Foundation

Framing

Floors!

Ceilings

Roofing

Siding

Drywall

Cabinets

Stairs

Insulation

Painting

Final Shots

The plumbers came out on a day in late August and rolled out the radiant tubing. All that orange tube had to be tied to the concrete mesh. True to form, the plumber gave me about 4 hours advance notice, which meant that I had to roll out the mesh by myself. Not fun. This is a shot of the Kitchen, Laundry & Powder Room.