Much
later in the day and they are slick troweling the floor. Unfortunately, the
day really heated up and cooked the concrete. The guys who were troweling
waited a little too long to trowel and the concrete had really really set
up, so they had to throw lots of water to bring the cream to the surface.
It started cracking by evening.