MKA Home Page

Totally Awesome House

The Design

Excavation

Blasting & Septic

Footings

Foundation

Framing

Floors!

Ceilings

Roofing

Siding

Drywall

Cabinets

Stairs

Insulation

Painting

Final Shots

Much later in the day and they are slick troweling the floor. Unfortunately, the day really heated up and cooked the concrete. The guys who were troweling waited a little too long to trowel and the concrete had really really set up, so they had to throw lots of water to bring the cream to the surface. It started cracking by evening.