MKA Home Page

Totally Awesome House

The Design

Excavation

Blasting & Septic

Footings

Foundation

Framing

Floors!

Ceilings

Roofing

Siding

Drywall

Cabinets

Stairs

Insulation

Painting

Final Shots

This is the Meditation Room floor structure. Double LVL beams are lagged into the side of the concrete wall. The concrete was crooked, twisted and leaning to the west, so there's some sloppy framing there.