MKA Home Page
Totally Awesome House
The Design
Excavation
Blasting & Septic
Footings
Foundation
Framing
Floors!
Ceilings
Roofing
Siding
Drywall
Cabinets
Stairs
Insulation
Painting
Final Shots
Laying on the ground beside the wonder truck are the curved glulam beams. Tomorrow, they should be up in place. The joists on the ground to the left of the white beams are all the framing members for the Master roof.