MKA Home Page
Totally Awesome House
The Design
Excavation
Blasting & Septic
Footings
Foundation
Framing
Floors!
Ceilings
Roofing
Siding
Drywall
Cabinets
Stairs
Insulation
Painting
Final Shots
This is the bridge deck, all completed. I've started to mark out the interior walls so that the plumber will know where to run the radiant tubing. The pillowy thing in the upper right corner of the picture is the protective tarp that I put back over the flat beam to keep it from damage by the elements.