MKA Home Page
Totally Awesome House
The Design
Excavation
Blasting & Septic
Footings
Foundation
Framing
Floors!
Ceilings
Roofing
Siding
Drywall
Cabinets
Stairs
Insulation
Painting
Final Shots
Another view of the front. I can't finish framing the Meditation Room walls until the slab is poured, since some of the wall is framed on the beam and some is framed on the slab. Who designed this thing?