MKA Home Page

Totally Awesome House

The Design

Excavation

Blasting & Septic

Footings

Foundation

Framing

Floors!

Ceilings

Roofing

Siding

Drywall

Cabinets

Stairs

Insulation

Painting

Final Shots

They are placing the nailbase down, which is 1/2" OSB board glued to 1" of rigid insulation. It will give them something to attach their metal roofing to when that time comes. The entire 4 layers of insulation and nailbase are held in place with 8" long screws.