MKA Home Page
Totally Awesome House
The Design
Excavation
Blasting & Septic
Footings
Foundation
Framing
Floors!
Ceilings
Roofing
Siding
Drywall
Cabinets
Stairs
Insulation
Painting
Final Shots
The Master roof is nearing completion. All that is left is to flash some of the penetrations, install the skylight and screw in the fascia termination bars. The roof actually does slope - about 3/8" per foot. Across the whole roof, that equals a drop of over 9". So it's not actually a flat roof.