MKA Home Page
Totally Awesome House
The Design
Excavation
Blasting & Septic
Footings
Foundation
Framing
Floors!
Ceilings
Roofing
Siding
Drywall
Cabinets
Stairs
Insulation
Painting
Final Shots
The start of the wood siding. I realized in May that I would not be able to finish the construction in a timely manner if I was putting up siding for two weeks, so I hired a crew to come do it. Sometime, I'll tell you about the folly of doing that. Here they've started on the north side of the Kitchen.