MKA Home Page
Totally Awesome House
The Design
Excavation
Blasting & Septic
Footings
Foundation
Framing
Floors!
Ceilings
Roofing
Siding
Drywall
Cabinets
Stairs
Insulation
Painting
Final Shots
Here is the North side of the house. The cantilever framing for the Meditation Room is complete. It hangs out there three feet from the face of the concrete wall on the right. Trust me, it's not bouncy at all.