MKA Home Page
Totally Awesome House
The Design
Excavation
Blasting & Septic
Footings
Foundation
Framing
Floors!
Ceilings
Roofing
Siding
Drywall
Cabinets
Stairs
Insulation
Painting
Final Shots
A rainy day and the deck for the Master floor is completed. I've moved the sawhorses up there and the parapet walls are starting. The beam on the left side of the pictures is for the bridge that comes from the Master Bedroom to the stair.