MKA Home Page
Totally Awesome House
The Design
Excavation
Blasting & Septic
Footings
Foundation
Framing
Floors!
Ceilings
Roofing
Siding
Drywall
Cabinets
Stairs
Insulation
Painting
Final Shots
The outer wythe is almost finished. You can see the headers above and below the window slot. There's also a header at the bottom of the wall under the windows to help the wall "float" a couple inches in front of and below the top of the concrete wall.